Sign Installation Permits – Designs and Documentation

Permit to place a sign and appropriate project documentation are an important part of the preparation for placing illuminated signs, signs, projecting signs, totems and other means of signage on business premises.

Metaling DOO Belgrade provides services for the preparation of technical and project documentation for placing signs, with the possibility of assisting in the process of obtaining the necessary consents and approvals before the competent institutions.

The type of documentation and the competent authority are determined according to the location, the surface of the sign, the method of attachment, the type of object and the applicable regulations. Therefore, it is advisable to check the installation conditions while planning the look and dimensions of the sign.

As part of the project preparation, the architectural and constructive solution, the appearance of signs, the method of assembly, electrical supply and other technical issues that may affect the issuance of the necessary approval are considered.

Sign Installation Permits in Belgrade – Designs and Approvals

Sign installation designs document the proposed signage solution and address the technical requirements of the relevant approval procedure.

On the territory of Belgrade, the field of outdoor signage is regulated by the Decision on signage in the territory of the city of Belgrade, its rules and annexes, as well as other appropriate regulations.

The decision governs the placement of various means of signage on public and other surfaces, including building facades, special sign structures and certain other locations.

When creating the project, it is necessary to take into account the rules for the specific type of sign, technical characteristics of the construction, installation safety and any special conditions for the protection of the space or object.

Information about the procedure and jurisdiction can be checked at the Department for signage Affairs of the Secretariat for Traffic of the City of Belgrade and the corresponding city municipality.

When Is a Sign Installation Permit Required?

The need for a permit to install an illuminated sign depends on its location, type, dimensions, construction and rules that apply to the specific location.

It is especially important to distinguish a business name sign from a signage medium that promotes products, services or business.

Certain simple business marks and sign structures may be subject to different rules, so it cannot be assumed in advance that every mark requires the same procedure.

The Difference Between Displaying a Business Name and an Advertising Sign

According to Article 6 of the Decision on signage in the territory of the city of Belgrade, the highlighting of a business name is specifically defined for a one-sided sign of a maximum area of 0.25 m², which contains the business name with data on the activity, headquarters and other mandatory elements prescribed by law.

Displaying a sign that does not correspond to those conditions in terms of surface or content can be considered as signage for one's own needs.

That is why it is necessary to distinguish a small board with prescribed business data from a larger signage inscription, illuminated letters, logos or other elements that serve to highlight and promote the business premises.

The mere fact that a sign contains the name of an establishment or a company does not automatically mean that the same rules apply to it as to a small business name sign.

Is a Permit Required for a Sign Smaller Than 2 m²?

For Belgrade, it is important to distinguish between the surface of the signage medium and the place of its placement.

Article 49 of the Decision foresees the jurisdiction of the organizational unit of the city municipality for communal affairs when the request refers to a signage tool with an area of less than 2 m² that is not located above the public area.

This does not mean that all signs smaller than 2 m² are exempt from obtaining a permit, nor that jurisdiction can be determined solely by area.

For signs above public areas, projecting signs, larger constructions and other special designs, it is necessary to determine jurisdiction according to the specific conditions of installation.

Permits for larger signs and special structures

The installation of sign structures of larger dimensions often requires more detailed technical documentation and additional checks of stability and installation conditions.

Signage totems, pylons, rooftop signs, large facade signs, projecting signs and other structurally demanding elements are specially considered.

Depending on the type and position of the sign, the procedure may include the competent city authority, the road manager and other institutions whose approvals are required.

Design Documentation for Sign Installation

Design documentation for signage placement is prepared according to the requirements of the specific procedure and the type of signage construction.

Depending on the object, the documentation can be made at the level of the project or study, in accordance with the appropriate rules and technical requirements.

The project may include general, textual, graphic and numerical documentation needed to display the signage medium, its construction and mounting method.

Technical description of sign structure

The technical description contains the basic characteristics of the signage medium and the data needed to understand the intended solution.

Depending on the project, they can be displayed:

  • Type and purpose of signage mark,
  • Exact placement location,
  • Dimensions and total area of sign,
  • Appearance, shape and colours of sign structure,
  • Materials intended for production,
  • Type and method of lighting,
  • The method of attachment to an object or special construction,
  • Assembly and maintenance access.

Technical drawings and graphic documentation

The graphic part of the project may contain a situational view of the location, the appearance of signs, dimensioned drawings, the position of signage on the facade and details of the planned construction.

In the case of signs placed on buildings, the relationship of the sign to the facade, entrances, windows and other architectural elements is particularly important.

The drawings are prepared in the appropriate scale and with the data required for the evaluation of the envisaged technical solution.

Structural calculation and proof of stability

For signage constructions for which such documentation is required, the project includes an appropriate load-bearing and stability check.

The structural calculation of the sign structure considers the intended loads, the method of support and attachment, as well as the characteristics of the supports and corresponding structural elements.

For outdoor signage, it is especially important to consider the influence of wind and the conditions to which the structure will be exposed.

Documentation may include details of the installation of the support on the object, as well as the attachment of the sign itself to the intended support structure.

Electrical installation project for illuminated signs

When the signage means is illuminated with electricity, the relevant part of the technical documentation may cover the power supply, electrical installations and the foreseen protection measures.

This is especially important for LED illuminated signs, 3D illuminated letters, light box signs, digital signage devices and other electrically powered signs.

The scope of the design is determined according to the installed equipment, the power supply method and the technical requirements of the specific project.

Technical control of project documentation

When prescribed, the technical control of project documentation is performed by authorized persons with appropriate professional qualifications.

The report on the performed technical control is part of the documentation that is attached in procedures where such control is mandatory.

The documentation is prepared in the prescribed form, with appropriate signatures and certifications.

Designing of signs and preparation of technical documentation for signage placement Example of project documentation for a permit to place a sign

Sign Installation Permits – Required Documentation

In order to initiate the process of obtaining a permit or approval, it is necessary to prepare appropriate administrative and technical documentation.

The list of attachments depends on the competent authority, the type of signage medium, the place of placement and the conditions of the specific procedure.

Documentation prepared or provided by the client

Depending on the procedure, the following data and documents may be requested from the client:

  1. Investor or applicant data – name of business entity, registration number, PIB and other necessary identification data.
  2. Proof of the right to use the surface – relevant documentation of ownership, lease or another basis for use, or the owner’s consent where required.
  3. Data on the signage medium – inscription, logo, type of sign, dimensions and intended method of lighting.
  4. Photos and location information - view of the facade, roof, wall or other surface on which the sign is placed.
  5. Electrical supply documentation – relevant information, an electricity bill and the metering point user’s consent where required for the proposed connection method.
  6. Power of Attorney – when the procedure is conducted on behalf of the client by an authorized representative.
  7. Other consents and evidence - according to the requirements of the competent authority and specific signage solution.

Before starting the procedure, it is necessary to check the current request form and the list of attachments with the competent authority.

Project documentation in paper and electronic form

According to Article 49 of the Decision on signage in the territory of the city of Belgrade, technical documentation in paper and digital PDF format, in the prescribed number of copies, is provided for the appropriate procedures.

Three copies of the technical documentation are specified in the provisions governing this procedure.

The way of completing, signing, certifying and handing over the documentation must be harmonized with the current requirements of the authority handling the case.

How Do You Obtain a Sign Installation Permit?

Permission for signage placement is obtained in a procedure that depends on the place of placement, the type of signage medium and the competent authority. There is no single procedure applicable to all signs.

For a typical project, the process may include the following stages:

  1. Analysis of the location: determination of the place of installation, type of object, dimensions of the sign and basic technical conditions.
  2. Jurisdiction check: identification of the authority leading the procedure and the necessary approvals.
  3. Preparation of the conceptual solution: defining the appearance, materials, dimensions and method of mounting the sign.
  4. Development of project documentation: preparation of appropriate technical descriptions, drawings, calculations and necessary parts of the project.
  5. Obtaining Consent: securing the consents required for a specific location and type of sign.
  6. Submission of request: submission of documentation to the competent authority.
  7. Addition of documentation: submission of any additional data requested by the competent authority.
  8. Decision on the request: the competent authority issues the appropriate act in the implemented procedure.

Metaling can provide assistance in the preparation of documentation and administrative monitoring of the procedure, to the extent agreed with the client.

The decision to issue a permit or approval is made by the competent authority, in accordance with the prescribed conditions.

Who Issues Sign Installation Permits in Belgrade?

The authority to issue a permit for the placement of signage means in Belgrade is determined according to the regulations, the type of sign, its surface and the place of placement.

City Municipality

For certain signs of less than 2 m² that are not placed above the public area, the organizational unit of the city municipality for communal affairs is responsible, in accordance with the relevant provisions of the city decision.

The procedure and documentation can be checked on the website of the competent municipality or by contacting its administration directly.

City Secretariat for Traffic

The Secretariat for Traffic of the City of Belgrade, or its corresponding organizational unit, is responsible for certain types of signage media.

Depending on the type and position of the signage medium, the prior consent of the road manager or other appropriate documentation may be required.

Before submitting a request, it is advisable to check the specific procedure with the competent authority, because jurisdiction is not determined only by the surface of the sign.

Permission to place signs in protected zones

Placing signs on objects that represent cultural property, as well as in protected spatial cultural-historical entities, may require special conditions and consents from competent institutions.

For such locations, it is necessary to check the possibility of placing a sign, its permitted dimensions, lighting method, position and impact on the architectural appearance of the object.

Consent of the institution for the protection of cultural monuments

In the cases stipulated by the regulations, the consent of the competent institution for the protection of cultural monuments may be required.

For Belgrade, it is particularly important to check the conditions that apply to protected buildings and spatial entities, including parts of the historic city core.

The appearance of the sign, its materials, lighting and method of attachment must be in accordance with the conditions applicable to the specific location.

Other special consents

Depending on the position of the signage medium and the technical solution, approvals from other competent institutions may be required.

They may refer to the protection of installations, infrastructure, special security requirements, position along a public road or other conditions arising from a specific location.

The type of consent required is determined for each individual project.

Permission to place signage on the roof of the building

Projects for rooftop signage are among the more structurally demanding signage signage projects due to the method of support, installation height and the load to which the structure is exposed.

In the case of rooftop signs, it is necessary to consider the stability of the sign structure, the method of connection with the supporting elements of the object, wind load and other technical requirements.

Electrical installations, lighting and maintenance access are also considered for illuminated rooftop signs.

The scope of design, required approvals and documentation costs depend on the construction and requirements of the specific object.

Check out Metaling's rooftop signage solutions.

Designs for Projecting Signs, Totems and Facade Signs

In addition to roof sign structures, project documentation may be required for various types of facade and free-standing means of signage.

Projecting signs

Projecting signs are attached to the appropriate construction that is connected to the wall or facade of the building.

During the design, the method of attachment, dimensions, position in relation to the public surface and structural stability are considered.

Learn more about two-sided projecting signs.

Signage totems and pylons

For free-standing signage totems and pylons, it is necessary to consider the supporting structure, the method of support and the appropriate installation conditions.

Depending on the size and purpose, the project may include structural details, appropriate calculations and electrical installations.

See signage totems and pylons.

Facade signage and illuminated letters

Facade signs can be made as individual 3D letters, light boxes, cut-out panels or other constructions.

When preparing the technical solution, it is necessary to take into account the characteristics of the facade, the place of attachment, the weight of the sign and the appropriate installation conditions.

See the possibilities of creating 3D sign letters.

Administrative Fees and Charges for Sign Installation

The costs of obtaining a permit may include appropriate administrative fees, costs of project documentation, special consents and other fees, when provided for by the relevant regulations.

It is important to distinguish project development costs from public fees that are determined in the process of approving and using the appropriate signage space.

What do fees and charges depend on?

The amount and the basis for calculation depend on the type of obligation and regulations that apply to a specific sign or place of placement.

Depending on the regulations, location, zone, type of signage medium, area, way of using signage space and other established criteria can be important.

That is why it is not correct to assume that all signs have the same fee or that the size of the sign never affects the total cost.

The current amount of administrative fees and other relevant obligations should be checked with the competent authority and according to the regulations that apply to the specific location.

Cost of Design Documentation for a Sign Permit

The cost of preparing a sign installation design depends on the sign type, dimensions, structure, location and scope of technical documentation.

Simpler signs may require a smaller scope of design, while rooftop signage, large signage totems and other demanding constructions may involve additional calculations, drawings and technical control.

What affects the cost of project documentation?

  • Type of sign: facade sign, 3D letters, projecting signs, roof structure or freestanding totem.
  • Dimensions and structural complexity: the size of the sign and the difficulty of its attachment or support.
  • Electrical installations: need to design power supply and lighting.
  • Location: special installation conditions and possible need for additional approvals.
  • Technical control: scope of project documentation control, when prescribed.
  • Administrative services: assistance with gathering consent, completing and submitting documentation.

In order to prepare a precise offer, it is necessary to submit information about the location, type of signage, expected dimensions and place of installation.

Why Should You Plan for a Permit Before Manufacturing a Sign?

Checking the installation conditions before the start of production allows the signage solution to be timely matched with the appropriate technical and administrative requirements.

In some cases, the competent authority or other institution may require a change in the dimensions, position, shape or lighting of the sign structure.

That is why it is recommended that the design of the sign, the creation of the necessary documentation and the planning of the production are coordinated with each other at the initial stage of the project.

Such an approach can reduce the risk of subsequent changes, additional costs and installation delays.

Sign Installation Permits – Frequently Asked Questions

Does every illuminated sign require a permit?

Permission to place a sign may be required depending on the type of signage medium, its position, dimensions and rules for the specific location. Conditions should be checked with the competent authority before installation.

Who Issues Sign Installation Permits in Belgrade?

Depending on the signage medium and the place of placement, the procedure may be under the jurisdiction of the corresponding city municipality or organizational unit of the City of Belgrade. Jurisdiction is determined according to current regulations.

Is a permit required to place a sign smaller than 2 m²?

A small area does not mean an automatic exemption from the obligation to obtain a permit. Municipal jurisdiction is provided for certain signs of less than 2 m² that are not above the public area, but it is necessary to check the specific conditions of placement.

What Is the Difference Between a Business Nameplate and an Advertising Sign?

The highlighting of a business name is specifically regulated by regulations. In Belgrade, a one-sided mark of a maximum area of 0.25 m² with prescribed data was defined for that purpose. Larger or differently shaped signs may constitute signage and are subject to the appropriate rules.

What Does a Sign Installation Design Include?

Depending on the type of sign and procedure, project documentation may contain technical description, drawings, construction data, stability calculations, assembly details, wiring and other necessary attachments.

Is a structural calculation of the sign structure required?

Structural calculation and appropriate structural documentation are required when prescribed or required by the characteristics of the concrete sign structure and approval procedure.

Is special documentation obtained for rooftop signs?

Rooftops often require more detailed structural design, including load, support and stability checks. The scope of required documentation and consent is determined for the specific location and construction.

Can Metaling help in obtaining a permit?

Metaling provides services for the preparation of project documentation and can provide assistance in the process of obtaining the necessary consents and approvals, to the extent agreed with the client. The final decision on issuing the permit is made by the competent authority.

What needs to be submitted for an offer?

The location of the object, a photo of the place of installation, the type of sign, the approximate dimensions and the available artwork are required for the initial assessment. Based on these data, it is possible to consider the scope of the required documentation.

Metaling - design, production and assembly of signs

Metaling deals with the design, production, assembly and servicing of signs for business and commercial objects.

Preparation of technical documentation is an important part of the implementation of projects where appropriate approval is required for signage.

Connecting the technical preparation with production and assembly enables a better alignment of the designed solution with the actual construction of the sign.

Learn more and request a quote

Note: Information on the procedure and competences is informative. The necessary documentation, competent authority and applicable conditions are determined according to the specific signage medium, location and regulations that apply at the time of submission of the request.